Natural Action TechnologiesTM*

DRIP LINE GROUND WATER TOXIC RELIEF KIT

Instruction and information sheet

(To use in conjunction with a Natural Action Technologies Structuring Device)

Installation Overview

The Kit Includes:

1 – T Connectorpage1image12376
1 – Straight Line Valve
2 – Watts PL-3007 1?2 inch MIP x 1/4inch OD Adaptors 25’’ of Flexible Tubing

The Drip Line Toxic Relief kit adapts to The Whole House Unit, Super Shower and Mini Shower. The factors needed to make the decision on which unit is right for you will be:

The Drip Line Toxic Relief kit adapts to The Whole House Unit, Super Shower and Mini Shower. The factors needed to make the decision on which unit is right for you will be:

  • The distance from the Wellhead to your Home. (If your home is over 100’ away from the Wellhead you will need a Whole House Unit in order to receive the highest energy impact.
  • The square footage of your home is also a factor. (If your house is larger than a mobile home, you will need a Whole House Unit.
  • If your home is over 300’ from the Wellhead, you will need an additional Unit. (You could save by placing a Mini or Super Shower unit at the Wellhead and the Whole House Unit in your home.

Basic Wellhead Design:

  • page2image904

    Instructions:

  1. The Drip line kit must be installed between the check valve and the wellhead. You will need to insure that you have (21 Inches) of pipe available to install the Structuring unit.
  2. Your installation must also be within 20 feet of the Wellhead to insure that you can run the Drip Line hose back into the Wellhead.
  3. Install your Structuring Device with the (Connection Tee) provided in your kit.
  4. Install the Watts PL-­?3007 ½ inch MIP x ¼ inch OD Adaptor to the Tee Connector.
  5. Attach one end of the ¼ inch OD Plastic Tubing to the OD adaptor that you have connected to the Tee Connector.
  6. At the Wellhead, find the inspection port. This will usually be a ½ inch plug. Remove the plug and replace it with the other Watts PL-­?3007 ½ inch MIP x ¼ inch OD Adaptor.
  7. Arrange the ¼ inch Plastic Tubing conveniently along the pipe back to the Wellhead. (You may use Zip Ties or Adhesive Tape to secure the line to the pipe as needed).
  8. Attach the ¼ inch Plastic Tubing to the adaptor you replaced on the inspection port.
  9. At a convenient point along the Plastic Tubing where you can install the Watts PL-­? 3011 Straight Line Valve. Cut the ¼ inch OD Plastic Tubing and insert each end of the tubing into the Straight Line Valve Connector

Straight Line Valve Connector adjustment:

When the handle is in line with the tubing, the valve will be fully open. When you turn the valve ¼ it will be fully closed.  You may initially leave the valve in the fully open position until you see and or feel a difference in your ground water.  You may then reduce the amount of water flowing into the Wellhead by turning the valve handle accordingly.

Congratulations! You will now be Structuring and enhancing the energy of the

water in the aquifer 1000’ in all directions!

*** IT IS ALL ABOUT ENERGY! ***

*Reprinted from Natural Action Technologies TM